Well work is continuing at a break neck pace. Today I installed the piece of obscure glass over the toilet area and then began the woodwork around the tub. Chris reupholstered the front of the bed frame after I had repaired all the damaged parts on it. I also refinished the cabinet doors and frame work below the bed frame. Alot of the original mahogany paneling, partitions and cabinet doors is in pretty rough shape so I’m having to cut parts away and replace it with maple plywood which will be painted. The “glory” work is done now, and we are entering the phase of doing alot of little puttery, time consuming jobs that are not as obvious as the new floor or paint job. Never the less, it’s all part of the job, and when I turn this RV over to the owner I want to be able to say I did my best with the resources in hand. Great craftsmanship is found not so much in the showy big parts of a project, but in the little details that make everything else look wonderful and work smoothly.