Airstream Repair and Renovation Day 2

Today, with everything that was touching the floor out of the way, I installed the laminate flooring.  I used an acrylic urethane glue, very aggressive and you have to work quickly with it, but it holds the floor great.  There was lots of cutting to make the boards fit around the curved front of the trailer , the wheel wells and the lavatory area, but all in all the entire floor went down in about 7 hours.  You probably are thinking we are doing this project a little backwards, but remember that we don’t have all the necessary new parts yet like the toilet and water heater, and while I have an extra pair of hands to help, I need to keep the project going full speed.  Typically, I would not put the flooring in until all the painting was done and alot of the cabinetry finished and installed.

Airstream Repair Floor half done Airstream Repair finished floor trailer back Airstream Repair   Finished floor  trailer front

Author: MC Ken on September 28, 2009
Category: Out of the Ordinary Projects

Leave a Reply

Last articles